HOW LONG DOES A CONSTRUCTION LAST?


A house can be built in a few days, having all the materials, counting on a large number of operarios; In the same way it can take several years in its construction if it takes a slow pace of work.

Of course everything will depend on various factors such as available capital, rents, credits, inflation rates and the number of workers suitable for the size and importance of the work. It is important to remember that at the end of the play has a slow pace due to the amount of detail that must intervene.

For all this it is advisable to make a program or work schedule, to establish stages in weeks and not in days, with the breaks and to set the rhythm that is wanted to take. Following in time and shape this calendar will give you greater insight into the progress of your work.

STEPS TO BUILD A WORK
1. The first will be to excavate to the level that has been marked in the project. If there were elements that supposed to stop the work as the discovery of archaeological remains, what happens, the work will stop without you can do anything. It is the part of the work that can expand more in time.

2. Once the excavation has been made and secured, the foundation of the future building is laid. This will be by shoes, slab or piles, as marked in draft, and is usually done in reinforced concrete. . In many cases the foundation is usually beastly, depending on the building it has to endure.

3. Having made the foundation, we already have the support of the whole building and from it the structure is born. We differentiate the elements of the vertical structure: pillars and walls, and horizontal: the forged. In order to execute them, the help of huge cranes is needed, which facilitates the transport of the material. The most common material of a structure is reinforced concrete.

4. When the structure already has its own resistance, the work of closing the facade gaps can be carried out while maintaining the design of the planes and in parallel performing the interior partitions that will shape the distributions drawn on paper.

5. Once the interior divisions are made the installers enter the scene. Works such as plumbing, electricity, gas, air conditioning and telecommunications provide the basic services for all homes, and their execution can be extended for several months.

6. Having the facilities, we will carry out the finishing work so that the work done by the previous professionals is not overlooked and can give a good aesthetic to the final building.